This was a new construction, consisting of two ground floor shops and two first floor three bedroom apartments, built to meticulous requirements of client.
Apartments & shops were 250 square metres each. Many hours where required to acquire a permit from both Town Planning & Building as the site was found to be flood prone during one in one hundred year floods. This was proven during construction when the surrounding streets & buildings all flooded except our site which was above the flood line.
The construction also posed high danger risks due to very close proximity to high voltage power lines, this required many discussions with service providers, a couple of street power shut downs, tricky wall panel & roofing installations with some handy crane control.
The shops were basic with air conditioning & suspended ceilings throughout with disabled toilet blocks to each, powder room & facilities for tea making. Aluminium shop fronts glazed in 12mm tempered & tinted glass. Servicing of shops via rear roller doors.
The apartments were each fitted with stone benches, full laminated Kitchens with second preparation pantry style Kitchens, three ensuites, fully fitted out separate laundry & large balconies.